Problem with windows 2003 task scheduler using IBM @series 235

Hai guys! I have 2 server IBM @series 235 with DLT 40/80 and using OS windows 2003. The problem is, when i try to create the multiple schedule backup using the nt backup that already have inside the windows 2003.

Windows Software 5498 This topic was started by ,


data/avatar/default/avatar03.webp

1 Posts
Location -
Joined 2004-09-14
Hai guys!
 
I have 2 server IBM @series 235 with DLT 40/80 and using OS windows 2003. The problem is, when i try to create the multiple schedule backup using the nt backup that already have inside the windows 2003. I create first job (overwrite and normal) at 9.15am and second job (deffential and append) at 5.00pm. It doesn't work at all. No error massage were given at the report nt backup. So anyone, who's know or ancounter the same problem.... can share with me....?
 
Regards.
 
Al-gojoe

Participate on our website and join the conversation

You have already an account on our website? Use the link below to login.
Login
Create a new user account. Registration is free and takes only a few seconds.
Register
This topic is archived. New comments cannot be posted and votes cannot be cast.